Value Delivered
EMCOR Services New York/New Jersey, Inc. provided complete turnkey installation of two 600-ton absorption chillers at One Lincoln Plaza, a mixed-use building housing ground-level retail, commercial tenants, and luxury condominiums.
We also retrofitted the building’s existing equipment, which was made for a complex rigging operation, and reconfigured large-diameter pipe. To save the client money, we provided value-engineering solutions for both rigging and piping trades.
Our ability to prefabricate a large portion of the new piping and set it in the mechanical equipment room, helped reduce labor hours. To accommodate the building’s new piping configuration, our design team specified the two chillers’ head connections.
Over two full weekends in the Lincoln Center area of Manhattan, we performed crane and rigging utilizing a rigging path through the existing 8th floor access doors. We completed our multi-phase rigging operation without interfering with the daily operations of this million-square-foot campus.
Client Objectives
The client needed to upgrade two absorption chillers in their central plant.
Solutions
Our comprehensive solutions included:
- Installing two 600-ton absorption chillers in four sections
- Retrofitting the building’s existing equipment
- Prefabricating piping
- Installing piping
- Crane and rigging services
Client Background
One Lincoln Plaza is a mixed-use luxury condominium built in 1969 with 44 stories including retail, restaurants, and eight floors of commercial tenants.